A New Bridge in Town!

Price Range
$8
Season(s)
Spring
Grade Level(s)
3rd — 12th & Family

TriMet is building the first bridge over the Willamette River in 40 years. Learn how a cable-stayed bridge works and how engineers chose a bridge design that minimizes impacts to river habitat and river users. Lab time is supplemented with a walk outside to view nearby bridge construction from the river bank.

Available Sessions

Dates Location Member/Non-member

A New Bridge in Town!

Start Date May 25, 2014
End Date May 25, 2014
Start and End Times 10-11am Sun
Duration 1 hr
Location OMSI
Member/Non-Member $8
Check In Please arrive at the Physics Lab in OMSI's Turbine Exhibit Hall at least 5 minutes before your class is scheduled to start.